logo

Detalhes dos produtos

Created with Pixso. Casa Created with Pixso. produtos Created with Pixso.
Linha de pré-tratamento
Created with Pixso.

Automatic Electrophoresis/Electrophoretic Coating Pretreatment Line

Automatic Electrophoresis/Electrophoretic Coating Pretreatment Line

Nome da marca: CHG
Número do modelo: AC-31
MOQ: 1 conjunto
preço: 100,000-200,000 USD
Condições de pagamento: ,MoneyGram,Western Union,T/T,D/P,D/A,L/C
Capacidade de abastecimento: 10 conjuntos por ano
Informações detalhadas
Lugar de origem:
China
Certificação:
CE, ISO
Modelo NÃO.:
AC-31
Substrato:
Metal
Doença:
novo, novo
Unidade de controle:
CLP
Marca registrada:
Chg
Código HS:
8424899100
Habilidade da fonte:
10/ano
Detalhes da embalagem:
Varia dependendo do design
Destacar:

Electrophoresis Electrophoretic Coating Line

,

Metal Substrate Electrophoretic Coating Line

,

Pretreatment Line

Descrição do produto

Metal Substrate Electrophoresis (E-Coating) Pretreatment Line with Customization Option

This advanced pretreatment line is engineered to deliver high-quality surface preparation for automotive metal components, providing an essential foundation for electrophoretic (E-coat) finishing. Each stage of the process has been carefully designed to remove contaminants, enhance coating adhesion, and ensure optimal surface condition prior to coating.

A key feature is the acid treatment step, which effectively eliminates oxides and stubborn residues, significantly improving coating performance and durability. The entire line is configured for consistent, efficient operation, utilizing precise process control and intelligent monitoring systems to maintain stability across all parameters—including chemical concentration, temperature, and treatment duration.

Process Workflow

The complete pretreatment sequence includes:

  1. Pre-Degreasing
    Initial removal of oils and surface contaminants to prepare parts for thorough cleaning.

  2. Degreasing
    Deep cleaning phase using chemical degreasers to eliminate residual grease and improve subsequent treatment effectiveness.

  3. Rinse 1
    First-stage water rinse to remove any remaining chemical residues.

  4. Rinse 2
    Second-stage rinse ensuring cleaner surfaces and reducing cross-contamination.

  5. Acid Treatment
    A crucial step that removes oxides, scales, and micro-contaminants while enhancing surface activation for superior coating adhesion.

  6. Rinse 1
    Initial rinse to neutralize and wash away acid residues.

  7. Rinse 2
    Final rinse to ensure perfectly clean surfaces before entering the electrophoretic coating process.

Applicable Workpiece Specifications

This pretreatment line is designed for automotive components with maximum dimensions of:

1.1 m × 4 m × 2 m

The system can be customized to accommodate different part sizes, production capacities, chemical systems, and layout requirements depending on your factory space and operational needs.



Pre-degreasing Degreasing Rinse 1 Rinse 2 Acid Treatment Rinse 1 Rinse 2
Number of rinse rings 6 6 4 4 Bath 4 4
Number of rinse tubes 12 12 8 8
8 8
Total number of nozzles 144 144 96 96
96 96
Workspace rinse zone (m) 3.0 2.0 2.0 1.0 10.0 1.3 -0.2
Type spray pump Cast iron Cast iron Cast iron Stainless steel Stainless steel Cast iron Stainless steel
Type heating pump Cast iron Cast iron




Bath level control Automatic Automatic Cascade Automatic Automatic Cascade Automatic


Automatic Electrophoresis/Electrophoretic Coating Pretreatment Line 0
Automatic Electrophoresis/Electrophoretic Coating Pretreatment Line 1

Automatic Electrophoresis/Electrophoretic Coating Pretreatment Line 2